OCTAVED- FEATURE HIGHLIGHTs
COLLABORATION
FOR BIGGER AND SMALLER TEAMS
There is in principal no difference whether a large or small team works together. Starting from two people working at the place they will sooner or later get into their way.
PARALLEL EDITING
Octaved has advanced collaboration features allowing for great teamwork with the least interference. The key idea behind Octaved’s collaboration features is to have the least amount of locking caused by editors working in an area. That limits other editors working in the same are as little as possible. With Octaved it is no problem that two or more editors are working on the same page in parallel. Work done by an editor automatically and in real-time updates what the other editors see. That avoids double work.
REAL-TIME UPDATES
Another example of collaboration is Octaved Media & Files. For example, if an editor adds a file, all other editors at the same place immediately see the new file – of course without the need to manually reload or refresh.
One editor is in his office another one on an airport at the other side of the globe. Can they work together on the same subject? With Octaved: Yes. And in real-time.
CONTACT US AND START YOUR FREE DEMO NOW!
The feature list above is quite lengthy but still covers only a part of Octaved's features. Octaved is very logical and easy to use. It just makes sense to try Octaved as there is no time you need to learn it.
- 30 days free trail
- All features included*
- Ready to use cloud version
* As long as Octaved runs in trial mode the event registration form and all email communication have a “trial version” banner.